Company in the stage of formation

Accelerating U.S. Water Infrastructure Reconstruction

Our Goal

To accelerate the solution of national infrastructure problems, including lead service line replacement and water-quality risk mitigation.

Drinking Water Infrastructure Needs Survey and Assessment (DWINSA)
Source: U.S. Environmental Protection Agency (EPA), 2025 Update to the 7th Drinking Water Infrastructure Needs Survey and Assessment (DWINSA), Fact Sheet, November 2025. EPA materials are generally public domain under 17 U.S.C. § 105; no endorsement by EPA is implied.

Methodological Basis

The method according to the article: “Using materials of radar mapping from spacecrafts as a way to increase reliability, as well as to reduce the cost and time of site selection for extended linear construction projects” , World Journal of Civil Engineering and Architecture, September 2, 2025

Methodological Basis
Location

Maryland, USA Physical office address will be published after lease execution.

All information on this website reflects planned activities and methodology. Regulated engineering services will be provided only after the company obtains the required Maryland Board for Professional Engineers firm permit and corresponding authorizations in other applicable jurisdictions.